Advertisements
Design and Implementation of a Weather Forecasting Package for Aviation Industry (Automated Flight Control System)
Content Structure of Design and Implementation of a Weather Forecasting Package for Aviation Industry (Automated Flight Control System)
The abstract contains the research problem, the objectives, methodology, results, and recommendations
- Chapter one of this thesis or project materials contains the background to the study, the research problem, the research questions, research objectives, research hypotheses, significance of the study, the scope of the study, organization of the study, and the operational definition of terms.
- Chapter two contains relevant literature on the issue under investigation. The chapter is divided into five parts which are the conceptual review, theoretical review, empirical review, conceptual framework, and gaps in research
- Chapter three contains the research design, study area, population, sample size and sampling technique, validity, reliability, source of data, operationalization of variables, research models, and data analysis method
- Chapter four contains the data analysis and the discussion of the findings
- Chapter five contains the summary of findings, conclusions, recommendations, contributions to knowledge, and recommendations for further studies.
- References: The references are in APA
- Questionnaire.
Abstract Of Design and Implementation of a Weather Forecasting Package for Aviation Industry (Automated Flight Control System)
The flagrant rate of plane crash in the country toady has given much concern and desire to carry out this โDesign and Implementation of a whether fore-casting package for aviation industriesโ.
The researcher having been a student for some years now was disturbed by the rate of plane crash and the rate at which lives and properties worth billions of naira were lost in the process.
Advertisements
Considering the economic hardship is the society today, changes must be made to the patterns of operation of the Aviation industries is our country so that timely and efficient decision-making is taken for efficient utilization of available resources.
Meteorologists should be provided with sophisticates instruments and equipment for whether observation and recording is order to reduce the rate of unpredictability in plane-crash in our country. The Nigerian Airport Authority Metrological Department and station was chosen as a case study.
The expected officers were interviewed in this department. The date used for the design were collected through this method and also through observation methods, which were carried out on several occasions of visit to this organisation. It was observed that, without a whether forecasting package, timely and efficient aviation operation would not be achieved.
Advertisements